Water treatment plants in Nepal
WTP, STP & ETP design
and construction

Water Treatment Plants (WTP)
Design begins with the water analysis. The treatment train is selected against that analysis and the intended use, not against a standard package: multi-stage filtration, activated carbon, water softening where hardness requires it, and reverse osmosis where dissolved solids or specific ions require it. Disinfection and post-treatment are specified to the end use — potable, process, or boiler feed.
Capacities delivered range from 1,000 to 10,000 litres per hour, across hotel, institutional and industrial projects, including the plant at Soaltee Westend Resort, Birgunj. Every component is named by brand and model at quotation stage.

Sewage Treatment Plants (STP)
Design begins with the water analysis. The treatment train is selected against that analysis and the intended use, not against a standard package: multi-stage filtration, activated carbon, water softening where hardness requires it, and reverse osmosis where dissolved solids or specific ions require it. Disinfection and post-treatment are specified to the end use — potable, process, or boiler feed.
Capacities delivered range from 1,000 to 10,000 litres per hour, across hotel, institutional and industrial projects, including the plant at Soaltee Westend Resort, Birgunj. Every component is named by brand and model at quotation stage.

Firefighting Systems
We deliver active and passive fire protection for commercial, industrial, and large-scale residential projects.
Active systems: firefighting pumps, system controllers, and automatic sprinkler systems, specified to NFPA and UL/FM standards.
Passive systems: firestop systems, fire-resistant construction materials, and intumescent coatings — designed to contain fire and smoke at compartment boundaries rather than suppress it. Our firestop work uses Hilti systems, which VIE TEC distributes in Nepal as the authorized country distributor. That means the tested, certified system on your drawing is the system that gets installed, supplied by the company installing it.
Both are designed to the occupancy classification and documented for compliance approval.

Pumping and irrigation
